If the node does not get reaped or edited, there is no message and the node is not noted.(Assumption: Considerations do not time out. This may be 100% wrong.)
In what time frame? This is similar to the halting problem. Unless you were to set a timeout on consideration votes, it would be difficult to know when it fails. OTOH, perhaps if there is a known value of keeps where it will no longer have the potential of succeeding, then perhaps a failure note could be generated. It still leaves that in-between case where there have not been enough votes to tell definitively what the results will be.
--MidLifeXis
In reply to Re: Messaging the result of a consideration
by MidLifeXis
in thread Messaging the result of a consideration
by chacham
| For: | Use: | ||
| & | & | ||
| < | < | ||
| > | > | ||
| [ | [ | ||
| ] | ] |